The ROBIN team created a great reputation in its two first projects and offered to work on a new bridge for km-116 of the Isfahan-Shiraz Highway in 2022 with an estimated duration of 2 to 3 years. Although this bridge is smaller comparing to the size of the bridge at km-209, the inspection and monitoring […]
Category Archives: project
Following the successful results in the first ROBIN’s project, the team successfully contracted a project in two phases for installation, and stability monitoring for the same bridge at km-209 of the Isfahan-Shiraz Highway.For the stability monitoring phase, the ROBIN team was responsible to design and run a set of tests on the bridge (inspections on […]
The first ROBIN’s project in inspection and quality control in manufacturing of the welded metal structure of the bridge to be installed at km-209 of Isfahan-Shiraz Highway. The ROBIN team was hired for the first time in 2018 to use NDT and the new ROBIN technology to quality control the manufacturing of welding, and the […]